Our Portfolio

filter


Cricket Valley Energy Center

aaa

Our second installment of a natural gas-fired power plant, Cricket Valley Energy Center a 1,100-megawatt combined-cycle power plant in Dover, New York, provides low-carbon, affordable, safe, and reliable power to one million additional homes in New York. Utilizing advanced emissions-control technology, CVEC operates as one of the most efficient power-generation facilities in the U.S. Unlike older facilities, CVEC is equipped with state-of-the-art emission-control technology, significantly reducing environmental impact.

Explore
aaa

Pharmacann

aaa

An 88,000 square foot addition and 54,000 square foot renovation to a previous Perreca Electric project and active cannabis grow facility. The installation included: An upgrade to the medium voltage infrastructure. Four, 4000a 480/277v additional services including future provisions for two more. A 2000 KW Generator with multiple transfer switches and roll up connection points for full back-up capability. Over 7,000 Grow room lighting fixtures Over 90 HVAC Air handling units Seven 308.5 Ton Air Cooled Chillers Fire & CO2 Alarm systems Mechanical & owner provided tooling and process equipment

Explore
aaa

Amazon Redtail

aaa

New construction of a build-to-suit 630,000 sq ft IDX Facility with installation of 8MW of Power and Controls for Material Handling Equipment, including medium voltage infrastructure, a 400kw Emergency Generator with a Fire Alarm & BDA Systems. BIM LOD300 Modeling Coordination. Manhours totaled 200,000 utilizing a work force made up of six-ten-hour days.

Explore
aaa

Onsemi

aaa

Project entailed total interior demolition and rebuild of a 725,000 square foot semiconductor plant. New Construction of a 325,000 square foot building. Job utilized a work force made up of six-ten-hour days. Peak manpower exceeded 365 electricians. Continuous service and support. BIM LOD300 – LOD500. Clean room services & maintenance. Power and data.

Explore
aaa

Matrix

aaa

New construction of two spec build warehouses. Building (A) is a 927,000 sq ft warehouse with a 4,000-amp service and 2,000+ Lights and fire alarm system. Building (B) is a 225,000 sq ft warehouse also with a 4,000-amp service consisting of 400+ lights and fire alarm system. TI scope added after building completion at Building (A) for Tesla consisting of additional lighting, PIT chargers and fire alarm. Manhours totaled 50,000

Explore
aaa

Amazon Sailfish

aaa

New construction of a build-to-suit 1,000,000 sq ft Fulfillment Facility with installation of 5MW of Power and Controls for Material Handling Equipment, including medium voltage infrastructure, a 400kw Emergency Generator with a Fire Alarm System. Manhours totaled 80,000 utilizing a work force made up of six-ten-hour days.

Explore
aaa

St. Luke’s Cornwall Hospital

aaa

Renovation to existing cafeteria at the hospital. New electrical distribution system and lighting in coordination with kitchen equipment. Fire alarm system installed. Renovation to existing first floor radiology department including the wiring of two new CT scan machines. Fire alarm, nurse call system and lighting distribution systems were also installed. Renovation of second, third and seventh floor patient rooms. This seventy room renovation included lighting, nurse call systems, fire alarm system, branch wiring and head wall equipment wiring.

Explore
aaa

Clarkstown Central School District

aaa

Provided new technology and power upgrades at fourteen schools within the district.

Explore
aaa

Dominican College

aaa

Design and build of electrical systems for a new three story classroom and laboratory facility.

Explore
aaa

Columbia University Research Facility

aaa

New Geochemistry Research facility at the Lamont-Doherty Earth Observatory Campus.

Explore
aaa

NYC DEP Headquarters and Lab

aaa

Renovation of existing DEP office building to a laboratory facility for the testing and monitoring of NYC reservoir water west of the Hudson River. Technical specification requirements for the monitoring and security system installed were complied with on this project.

Explore
aaa

Orange County 911 Center

aaa

New 90,000 square foot state of the art county 911 center and renovation of existing fire training facility. 911 Center also houses the county office of emergency management and disaster recovery center.

Explore
aaa

OCCC Kaplan Hall

aaa

New clean energy construction management project of a 90,000 square foot college classroom facility with accompanying 190,000 square foot parking garage. Project also includes the installation of a 16.5 kilowatt photovoltaic array on the roof. For more info on OCCC’s state of the art Newburgh NY campus, visit here.

Explore
aaa

Dynegy Power Plants

aaa

On going relationship servicing Roseton and Danskammer plants on the Hudson River meeting all aspects of the electrial needs of the plants. 24 hour on call servicing needs maintained to keep the plants operational.

Explore
aaa

Catskill Regional Medical Center

aaa

Perreca Electric was hired to design and renovate the existing electrical systems for the Labor and Delivery section of the Medical Center.

Explore
aaa

Orange and Rockland Utilities

aaa

Provided substation construction at various power company sites in the Hudson Valley.

Explore
aaa

St. Luke’s Cornwall Medical Building

aaa

Approximate 55,000 square foot addition to existing hospital. Addition added an ambulatory surgical center and pharmacy to the hospital facility. Physician tenant space was also included in the addition.

Explore
aaa

Metro North Railroad

aaa

Provided the electrical installation upgrade for five stations.

Explore
aaa

Mount Saint Mary College Dormitories

aaa

Expanded school student housing by renovated existing dorm building and adding new dorms. All dorms have new efficient lighting, power, fire alarm, phone, data and wireless access points.

Explore
aaa

Hotel Thayer at West Point

aaa

Renovation of historic hotel on West Point grounds including 151 guest rooms, 10 meeting rooms and a dining hall. This was a fast paced efficient running project.

Explore
aaa

Mount Saint Mary Sakac Hall

aaa

Newly renovated dormitory building, for residence with 2,4 and 6 bedroom suites. Installed new efficient lighting, power and fire alarms.

Explore
aaa

Gap/Old Navy

aaa

New 2,500,000 square foot Gap/Old Navy Distribution Center. Building foot print covers 55 acres. Phase II of the contract included the design build of the electrical specifications of the contract.

Explore
aaa

Homewood Suites

aaa

New construction of a 125 room facility with an indoor pool and conference center. Each studio suite features separate living and sleeping areas. In addition each room has a fully equipped kitchen.

Explore
aaa

Target Retail Store

aaa

New construction of Target store in the Town of Newburgh. Fast paced construction project with unique layout design for this specific facility.

Explore
aaa

Skirball Cardiovascular Center

aaa

Perreca was the chosen electrical contractor for the electrical design and construction of a new cardiovascular research facility.

Explore
aaa

Rockland Psychiatric Center

aaa

Provided site improvements and new Construction of research annex.

Explore
aaa

Glen Arden, Inc.

aaa

500,000 square foot assisted living community with a 125,000 square foot attached nursing facility.

Explore
aaa

Tilcon

aaa

Renovations and upgrades to all Hudson Valley rock quarry plants on a 24/7 basis.  Project also included transformer PCB removal and disposal. Perreca’s highly trained and certified (MSHA, OSHA and NFPA-70E) workforce performs all aspects of Tilcon’s electrical needs in a safe, timely, efficient and productive manner for all plants in the Husdon Valley.

Explore
aaa

Helen Hayes Hospital

aaa

New construction of a child daycare center.

Explore
aaa

Newburgh-Beacon Bridge

aaa

Fast paced installation of camera and security systems above and below span and on roadways entering and exiting bridges. Installation of six miles of fiber optic cable on two spans of bridge crossing the Hudson River. Expertise in house to handle fiber optic technical specifications of this contract.

Explore
aaa

Hudson River Visitor and Education Center

aaa

LEED rated platinum 4,000 square foot visitor and education center on the Hudson River. Project also included the renovation to an existing abandoned historical brick factory on Dennings Point. Installation of electrical distribution system, emergency power, energy efficient fluorescent lighting, integrated green technology with GEOthermal heating and cooling system including wind and solar panels. Installation of data and wireless systems for classroom and interactive education. Audio visual system complete with theatrical lighting and sound system for group events was also part of this project.

Explore
aaa

Waste Management Material Recovery and Compost

aaa

Electrical service for a material recovery building. Materials include newspapers, glass and plastic from recycling measures. In addition, installed electrical services for a co-compost facility. This facility processes waste from waste water treatment facilities and transforms the waste into reusable compost.

Explore
aaa

Southeastern Container

aaa

Total renovation of existing 30 dock facility including internal and external site work. Assistance of design of project as the job progressed for the electrical service for the manufacturing of soda bottle facility.

Explore
aaa

Eastern Correctional Facility

aaa

Provided audio and video surveillance system in solitary confinement cell block.

Explore
aaa

Mount Saint Mary’s College

aaa

Perreca designed and built the electrical system for the addition to the science and technology building which included the relocation of administration offices and classrooms including labs. The nursing department was completely renovated with this project. In addition, classrooms were converted to faculty offices.

Explore
aaa

Route 17 Interchange Maintenance Facility

aaa

The Maintenance Facilities is structured to an environmentally friendly green technology into the design of the buildings to enhance energy efficiency. The Maintenance Facility includes four Buildings; cold Storage Building, Maintenance Building, two Salt Storage Buildings, and a Vehicle Storage building. A new State Police Barracks Building. The new toll facilities included a new toll utility building for administrative needs and Toll Operations, Entering and exiting toll plazas with high-speed E-ZPass and covered walkways between the plazas and the toll utility building.

Explore
aaa

Val-Kill and FDR Curatorial

aaa

Personal effects of FDR’s childhood thru his years as President. Home of Eleanor Roosevelt at Valkill – Rehab Museum and Gift Shop. Upgraded electrical and fire alarm system.

Explore
aaa

FedEx

aaa

New seventy two dock addition.  This addition included an electrical distribution system and lighting.

Explore
aaa

Spectrawatt

aaa

State of the art photovoltaic cell manufacturing facility located at the Hudson Valley Research Park with an initial product line capacity of 60 megawatts with future growth estimated to 120 megawatts.

Explore
aaa

Franklin and Eleanor Roosevelt Institute

aaa

Renovation of Auditorium and Gift Shop. Upgraded Fire Alarm System.

Explore
aaa

Stewart International Airport – Runway Renovation

aaa

Removal and reinstallation of in pavement airport lighting in conjunction with milling and paving operation with special attention for elevation tolerances based on FAA specifications.  Installation of in pavement temperature sensoring system which monitors for cold weather conditions for salting of runway.  The airport runway remained fully operational while this project was underway.

Explore
aaa

Lowe’s Home Improvement

aaa

New Lowes Home and Improvement Center. Provided all the electrical installation for the new 140,000 square foot facility.

Explore
aaa

Arctic Glacier

aaa

Renovation and addition of existing warehouse to a manufacturing plant of ice cubes. Design build with elaborate refrigerant control system.

Explore
aaa

St. Luke’s Hospital Cornwall – Parking Garage

aaa

Perreca designed and constructed a five level parking garage with connecting enclosed pedestrian bridge to existing hospital.  Garage included heliport pad, emergency generator, CCTV sytem and a rescue assistance system.

Explore
aaa

Monticello Raceway and Casino

aaa

Renovation of existing harness track to accommodate 1,800 video slot machine Racino. Project included a restaurant, lounge and State Police annex. Job duration was three months.

Explore
aaa

Uno Chicago Bar and Grill

aaa

New restaurant and bar.

Explore
aaa

Hudson Valley Imaging

aaa

New construction of medical office building which included medical offices, patient waiting areas and examination rooms.  Building also has a CT Scan and Mammograghy examination rooms.  Project was completed on a 3 month time schedule.

Explore
aaa

Chili’s Restaurant

aaa

New restaurant and bar.

Explore
aaa

Taylor Recycling Facility

aaa

24/7 service provided to this waste recovery site operational in the Hudson Valley.

Explore
aaa

Conway

aaa

Seventy eight new docks and renovation to eighty existing docks for CCX distribution center.  New service distribution, lighting and site lighting were all part of this project.

Explore
aaa

Hudson Baylor

aaa

24/7 service provided to keep multiple recycling plants operational in the Hudson Valley.

Explore
aaa

LSI Lighting

aaa

New manufacturing building including service, lighting, distribution and fire alarm system.  This was a fast moving construction project.  Facility was up and running in eight months.

Explore
aaa

Hudson River Psychiatric Center – Ross Pavilion

aaa

New fire alarm system was installed in this historic three story patient facility known as Ross Pavilion. This was a fast paced job lasting only three months.

Explore
aaa

Citizen’s Bank

aaa

Ground up construction of a new 4,000 square foot with drive thru for Citizens Bank. Installed site lighting, electrical service, interior lighting and fire alarm. In the parking lot of the Dutchess Mall.

Explore
aaa

Pfizer Pharmaceuticals

aaa

New construction of two new research and development facilities with a combined square footage over 350,000.  Renovation of existing 125,000 square foot research facility.  Site wide primary infrastructure upgrade.

Explore
aaa

Taconic DDSO

aaa

Removed and replaced the complete fire alarm system throughout the twenty buildings on campus.

Explore
aaa

Stewart International Airport

aaa

Operated as a general contractor to construct a lighting control vault building of approximately 1500 square feet. This building controlled all airfield lighting circuits for the airport. Upgraded airfield lighting infrastructure with 14 aircraft rated manholes, installing a mile of conduit duct bank and 40,000 feet of cable. Relocated light circuits to new control vault while airport remained operational.

Explore
aaa

Dutchess County Airport

aaa

Upgraded runway edge lighting with new 1200 feet of duct bank, 15,000 linear feet of conduit, 28,000 feet of cabling and lighting.  Coordinated wiring of an EMAS, Engineered Material Arresting System.

Explore
aaa

SUNY New Paltz

aaa

Designed and built electrical systems for new construction of SUNY New Paltz Student Union Building.

Explore
aaa

Walmart

aaa

Walmart had no security or data systems for its Grand Opening at its Newburgh location. Perreca responded tool and material with 45 men, within 8 hours to work a 24 hour schedule for 4 days to meet the opening schedule.

Explore
aaa

Matrix Distribution Center

aaa

This project included ground up construction of a 600,000 square foot temperature-controlled warehouse for regional distribution of pharmaceuticals. Based on LEED-like design, the building features LED Hi-Bay and Low-Bay lighting controlled by built-in occupancy sensors throughout the space. UPS and emergency back-up for sensitive conveyor systems were also included.

Explore
aaa

Air National Guard Solar

aaa

This project included the installation of roof-mounted Photovoltaic panels, which connects into the campus’s electrical grid.

Explore
aaa

Resorts World Casino

aaa

This project for Adelaar Resort, host to Resorts World Casino Catskills, included all exterior site lighting, underground electrical, and communication utilities that would support a 1 million square foot site including a casino, hotel, parking garage, future golf course and waterpark, and separate onsite utility plant.

Explore
aaa

Vassar Brothers Hospital

aaa

New five story 225,000 square foot wing including operating rooms, emergency room, labor and delivery and kitchen. Removed and replaced fire alarm system throughout entire existing hospital. Removed and replaced primary loop system throughtout the campus.

Explore
aaa

Bowline Generating Facility

aaa

Explore
aaa

Woodbury Commons Premium Outlets

aaa

This project included the modification, relocation and expansion of the existing site’s primary distribution loop. This allowed expansion of the commons ranging from retail space, 75,000 square foot Market Hall Food Court and new welcome center with custom heated bus shelters.

Explore
aaa

Central Hudson

aaa

This project involved upgrading the corporate headquarters UPS system and includes a multilayer on-call contract.

Explore
aaa

M&T Bank

aaa

This LEEDS Gold project began with ground up construction and features LED lighting, efficient light controls,  geothermal heating and cooling in a compact modern design.

Explore
aaa

Onsemi Semiconductor Facility

aaa

Project entailed total interior demolition and rebuild of a 725,000 square foot semi conductor plant. Addition of a 325,000 square foot building. Job utilized a work force of a six day ten hour schedule. Peak manpower exceeded 365 electricians.

Explore
aaa

CPV: Valley Energy Center

aaa

This project included the new construction of a 680 megawatt natural gas-fueled combined-cycle electric generation facility. The facility’s environmentally-responsible design features highly efficient technology and state-of-the-art emissions controls, making it one of New York’s cleanest natural gas energy facilities once complete. During operations, the facility will produce enough electricity to power more than 650,000 homes, helping to meet the demand for local, reliable power in the lower Hudson Valley.

Explore
aaa

The Shops at Nanuet

aaa

This project included the demolition of an existing section of the mall, and a rebuild of all electrical site lighting and electrical utilities to the new buildings.

Explore
aaa