https://perreca.com/porfolio/dutchess-county-airport/
Upgraded runway edge lighting with new 1200 feet of duct bank, 15,000 linear feet of conduit, 28,000 feet of cabling and lighting. Coordinated wiring of an EMAS, Engineered Material Arresting System.
https://perreca.com/porfolio/stewart-international-airport/
Operated as a general contractor to construct a lighting control vault building of approximately 1500 square feet. This building controlled all airfield lighting circuits for the airport.
https://perreca.com/porfolio/stewart-international-airport-runway-renovation/
Removal and reinstallation of in pavement airport lighting in conjunction with milling and paving operation with special attention for elevation tolerances based on FAA specifications.